On 16 November 2024, as the server stirred back to life, Levi posted his house with the note “base coming along nicely”. 1 The next day he reported that the upper floor was not yet done but the lower floor was complete. 2 prop spotted a “wine barrel room under the stairs”. 3 Levi struggled with the roof and asked prop for help.
Pictures
Primary sources
-
@prop base coming along nicely
-
Levi\_oof: upper floor is not yet done but lower fllor is complete
-
ProPlayerPlayz: wine barrel room under the stairs
