AxolotlMuseum

Levi's House

Levi's Season 3 house, with a finished lower floor and a wine barrel room under the stairs.

Place ASMP S3 base

On 16 November 2024, as the server stirred back to life, Levi posted his house with the note “base coming along nicely”. 1 The next day he reported that the upper floor was not yet done but the lower floor was complete. 2 prop spotted a “wine barrel room under the stairs”. 3 Levi struggled with the roof and asked prop for help.

  1. Levi · 16 Nov 2024 · #asmp-s3-mc-chat @prop base coming along nicely
  2. ASMP Chat · 17 Nov 2024 · #asmp-s3-mc-chat Levi\_oof: upper floor is not yet done but lower fllor is complete
  3. ASMP Chat · 17 Nov 2024 · #asmp-s3-mc-chat ProPlayerPlayz: wine barrel room under the stairs